Orange Line (Montreal Metro)
Orange Line / Ligne Orange | |||
---|---|---|---|
Overview | |||
Native name | Ligne Orange | ||
Line number | 2 | ||
Locale | Montreal, Quebec, Canada | ||
Termini | |||
Stations | 31 | ||
Service | |||
Type | Rapid transit | ||
System | Montreal Metro | ||
Operator(s) | Société de transport de Montréal (STM) | ||
Depot(s) | Plateau d'Youville, Saint-Charles, Montmorency, Centre d'attachement Duvernay, Snowdon tail tracks and connecting track, Côte-Vertu | ||
Rolling stock | Bombardier/Alstom MPM-10 (Azur) | ||
History | |||
Opened | October 14, 1966 | ||
28 April 1980 | Opening of western extension to Place-Saint-Henri | ||
7 September 1981 | Opening of northern extension to Snowdon | ||
28 April 2007 | Opening of northern extension to Montmorency | ||
Technical | |||
Line length | 30.0 km (18.6 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | "Third rail", 750 V DC on the guide bars at either side of the track | ||
Operating speed | 25–72 km/h (16–45 mph) | ||
|
The Orange Line (French: Ligne orange, pronounced [liɲ ɔʁɑ̃ʒ]), also known as Line 2 (French: Ligne 2), is the longest and first-planned of the four subway lines of the Montreal Metro in Montreal, Quebec, Canada. It formed part of the initial network, and was extended from 1980 to 1986. On April 28, 2007, three new stations in Laval opened making it the second line to leave Montreal Island.
The Orange Line measures 30 kilometres (19 mi) in length and counts 31 stations. It is the longest subway line in Montreal and the second-longest in Canada after the Line 1 Yonge–University of the Toronto subway. Like the rest of the Metro network, it is entirely underground. The line runs in a U-shape (also similar to Line 1 Yonge-University) from Côte-Vertu in western Montreal to Montmorency in Laval, northwest of Montreal.
History
[edit]On November 3, 1961, Montreal City Council approved an initial Metro network 16 kilometres (9.9 mi) in length.[1] Line 2 (Orange Line) was to run from north of the downtown, from Crémazie station through various residential neighbourhoods to the business district at Place-d'Armes station.[2]
Work on the Orange Line began on May 23, 1962 on Berri Street just south of Jarry Street.[3][4] In November 1962, the city of Montreal learned that it had been awarded the 1967 International and Universal Exposition (commonly known as Expo 67). To better meet the anticipated demand for transit during Expo 67, it was decided on August 6, 1963 to add the Sauvé and Henri-Bourassa stations in the north, and the Square-Victoria-OACI and Bonaventure stations in the south.[5]
On October 14, 1966, the section between Henri-Bourassa and Place-d'Armes opened, forming part of the original Metro network.[6] Completion of smaller sections were delayed by several months. On February 6, 1967, the segment from Place-d'Armes to Square-Victoria-OACI opened, followed on February 13, 1967, by Bonaventure.
Prior to the inauguration of the initial network, extensions were proposed in all directions, including the West Island. In its 1967 Urban Plan, entitled "Horizon 2000",[7] the city of Montreal planned to build a network of almost 100 miles (160 km) by the end of the twentieth century. On February 12, 1971, the council of the Montreal Urban Community authorized the borrowing of C$430 million to extend the Metro. This amount increased to C$665 million in 1973, and to C$1.6 billion in 1975. This expansion plan included the costs of extending the Orange Line westward, a distance of 20.5 kilometres (12.7 mi), adding 16 new stations, as well as the construction of a new garage.[8] The terminus station, Salaberry, would have been an intermodal station with Bois-Franc commuter rail station.
From the beginning, the plan was to expand the Metro to the northwest, but massive cost overruns on the expansion of the Green Line in preparation for the 1976 Summer Olympics, led to several years of delays, including a moratorium on underground expansions in 1976. To cut costs, three planned stations (Poirier, Bois-Franc, De Salaberry) and a maintenance workshop at the end of the track were eliminated.
In 1979, the Minister of Transport, Denis de Belleval, proposed to complete the subway extension to Du Collège and to extend the rest of the line above ground. This transportation plan was rejected by the mayors of the Montreal Urban Community. The moratorium was lifted in February 1981, with a new agreement that approved the construction of one additional station, Côte-Vertu. Du Collège was considered inappropriate to play the role of a terminus.
The western segment was constructed in the 1980s and was opened in several stages. On April 28, 1980, it was extended from Bonaventure to Place-Saint-Henri. From there, the line was extended to Snowdon on September 7, 1981, on January 4, 1982 to Côte-Sainte-Catherine, on June 29, 1982 to Plamondon, on January 9, 1984 to Du Collège, and finally on November 3, 1986 to the western terminus of Côte-Vertu.
Laval extension
[edit]After a break of more than two decades of expansion, the eastern segment was extended from Henri-Bourassa by three stations into the city of Laval. The 5.2 kilometres (3.2 mi) section required digging a tunnel under the Rivière des Prairies. The three stations were Cartier, De la Concorde and Montmorency. Montmorency station is near Collège Montmorency and the Laval campus of the Université de Montréal.
The Laval extension was inaugurated on April 26, 2007, and it opened to the public on April 28. It was completely financed by the Government of Quebec, which mandated for the former Agence métropolitaine de transport (AMT) (now ARTM) to realize the project. The STM acted as a subcontractor for the AMT and was responsible for the installation of fixed equipment. The project extended the Orange Line by 5.2 kilometres (3.2 mi), 4.9 kilometres (3.0 mi) not including the depot past Montmorency, at a cost of roughly C$143.27 million/km, which is slightly below the average cost for Metro extensions in other major cities. The total cost of the extension was $745 million.[9] To that amount, $12.4 million was added in 2008 to build a second entrance to Cartier station in Libellules Park, located northeast of the intersection of des Laurentides and Cartier.
Accessibility
[edit]When opened in 2007, the stations on the Laval extension were the first accessible stations on the Metro, with elevators and other features for disabled persons.[10][11]
In the 2010s and 2020s, older stations were retrofitted to be made accessible, with the installation of elevators.[12] As of 2024[update], 16 of the 31 Orange Line stations are accessible, including all four interchange stations at Berri-UQAM, Lionel-Groulx, Jean-Talon and Snowdon.[13] STM plans for all stations to be made accessible by the late 2030s.[14]
Platform edge doors
[edit]In 2019, the STM announced plans to install platform edge doors on the Orange Line, to improve safety and reduce passenger incidents (dropped objects, falls etc).[15] The 2021-2030 Capital Expenditure Program estimated the project would cost around $560m.[16] Due to financial difficulties following the COVID-19 pandemic, the project was cancelled in 2022.[17]
Future extensions
[edit]In the medium term, there are plans for the Orange Line to be further extended toward the northwest from Côte-Vertu. The extension would include two new stations: Poirier and Bois-Franc. The latter would create a transportation hub with the existing Bois-Franc station on the Réseau express métropolitain light metro.[18]
After the extension of the line into Laval, Gilles Vaillancourt, a former mayor of Laval, suggested for a further six stations to be added to the line. Three of them would be in Laval and three in Montreal, which would together turn the Orange Line into a loop.[19] In 2011, the City of Laval proposed adding eight more stations to the line, including five in Laval, to complete the loop and to serve the Carrefour Laval terminus.[20]
On 18 June 2019, the Autorité régionale de transport métropolitain approved a report for extending the Orange Line by 6.4 km to the north and east of the current Côte-Vertu terminus in St-Laurent to Montmorency station in Laval, which would create a loop. Five new stations would be built located at Poirier Street, Bois-Franc, and Gouin Boulevard in Montreal, and at Chomedey and Notre-Dame Boulevard near Autoroute 15 in Laval. The extension would cost an estimated $4.5 billion and put the project in line with the estimated $4.5-billion cost of the Blue Line extension to Anjou.[21]
Infrastructure
[edit]Maintenance
[edit]The Metro trains are stored in the Saint-Charles Garage, north of Henri-Bourassa station, and in the garage at Montmorency station for passenger cars. They are maintained at the Plateau d'Youville, which is located between Crémazie and Sauvé stations. Centre d'attachement Duvernay, which is connected to the Green Line, is used for maintenance of way equipment. The Snowdon tail tracks and connecting track, which is connected to the Blue Line, is also used for maintenance of way equipment.
A new garage was built immediately north of Côte-Vertu station that opened in March 2022, expanding the capacity of the Orange line by 25% and reducing wait time between trains from 2 minutes and 30 seconds to 2 minutes across the entire line.[22]
Service
[edit]Operation hours and frequency
[edit]The Orange Line operates between 5:30 a.m. and 12:30 a.m on weekdays and Sunday, and between 5:30 a.m. and 1:00 a.m on Saturday.[23] Trains arrive at stations every 2 to 7 minutes during peak periods, every 3 to 8 minutes during off peak periods, and every 6 to 11 minutes at weekends.[23]
Rolling stock
[edit]At the line's opening in 1966, MR-63 cars were used on the Orange Line. In the early 1980s, MR-73 cars replaced the older MR-63 cars, which were used again on the Green Line. Introduced in 1976, the MR-73 is the second generation of high-performance Metro cars, identified by rectangular cab headlights, blue and dark orange interiors, 124 kW (166 hp) traction motors that growl while they accelerate out of a station, side vents, and a unique three-note sound signature when the train pulls out of a station.
With the introduction of the newer MPM-10 trains in 2016, the MR-73 trains in service on the line were gradually transferred over to the Green, Yellow, and Blue Lines. On June 20, 2018, a decorated MR-63 train gave a final "farewell tour" of the Orange Line before the model was retired from the entire system the following day. All remaining MR-73 cars operating on the line had been transferred over to the other lines by 2019.
List of stations
[edit]Station | Inauguration date | Odonym | Namesake | Transfers/connections | Location |
---|---|---|---|---|---|
Côte-Vertu | September 3, 1986 | Côte-Vertu Boulevard | Notre-Dame-de-la-Vertu (Our Lady of Virtue; 18th century name for the area) |
Terminus Côte-Vertu | Saint-Laurent |
Du Collège | January 9, 1984 | Du Collège Street | Cégep de Saint-Laurent (local cégep) | ||
De La Savane | De la Savane Street | savane (a savanna or Québécois for swamp) |
Côte-des-Neiges– Notre-Dame-de-Grâce | ||
Namur | Namur Street | Namur, Belgium | |||
Plamondon | June 29, 1982 | Plamondon Avenue | Antoine Plamondon (Québécois painter) Rodolphe Plamondon[24] (Québécois lyric artist) | ||
Côte-Sainte-Catherine | January 4, 1982 | Côte-Sainte-Catherine Road | Côte Sainte-Catherine, 18th century name for area of Outremont | ||
Snowdon | September 7, 1981 | Snowdon Street, Snowdon neighbourhood | Name of area's former landowner | Blue Line | |
Villa-Maria | Villa-Maria High School | Latin form of Ville-Marie (former name of Montreal) | |||
Vendôme | De Vendôme Avenue | Likely from the French Dukes of Vendôme | At Vendôme: | ||
Place-Saint-Henri | April 28, 1980 | Place Saint-Henri | A parish church named for Saint Henry II (to commemorate Fr. Henri-Auguste Roux) |
Le Sud-Ouest | |
Lionel-Groulx | Lionel-Groulx Avenue | Fr. Lionel Groulx, Quebec historian | Green Line | ||
Georges-Vanier | Georges-Vanier Boulevard | Georges Vanier, Governor General of Canada | |||
Lucien-L'Allier | Lucien-L'Allier Street | Lucien L'Allier (General Manager of the Transit Commission when the Metro opened) |
At Lucien-L'Allier: | Ville-Marie | |
Bonaventure | February 13, 1967 | Place Bonaventure | Bonaventure Station, in turn for former Bonaventure Street St. Bonaventure, Italian cleric |
At Montreal Central Station: | |
Square-Victoria-OACI | February 7, 1967 | Victoria Square; | Queen Victoria ICAO headquarters |
||
Place-d'Armes | October 14, 1966 | Place d'Armes | Historical rallying point for city's defenders | ||
Champ-de-Mars | Champ de Mars Park | Common term for military exercise ground (Mars, god of war) |
|||
Berri-UQAM | Berri Street Université du Québec à Montréal De Montigny Street |
Simon Després dit Le Berry and Testard de Montigny |
| ||
Sherbrooke | Sherbrooke Street | John Coape Sherbrooke (governor-general of British North America) |
Le Plateau- Mont-Royal | ||
Mont-Royal | Mount Royal Avenue | Mount Royal | |||
Laurier | Laurier Avenue | Wilfrid Laurier, Prime Minister of Canada | |||
Rosemont | Rosemont Boulevard; Rosemont neighbourhood | Named by developer U.-H. Dandurand for his mother, née Rose Phillips | Rosemont– La Petite-Prairie | ||
Beaubien | Beaubien Street | Prominent landowning family | |||
Jean-Talon | Jean Talon Street | Jean Talon, intendant of New France | Blue Line | Villeray– Saint-Michel– Parc-Extension | |
Jarry | Jarry Street | Stanislas Blénier dit Jarry père, landowner Honoré-Bernard Bleignier Jarry |
|||
Crémazie | Crémazie Boulevard | Octave Crémazie, Quebec poet | |||
Sauvé | Sauvé Street | Name of a landowner | At Sauvé station: | Ahuntisic- Cartierville | |
Henri-Bourassa | Henri Bourassa Boulevard | Henri Bourassa, Québécois journalist and politician | Terminus Henri-Bourassa | ||
Cartier | April 28, 2007 | Cartier Boulevard | Sir George-Étienne Cartier Québécois politician, Father of Confederation | Terminus Cartier | Laval |
De La Concorde | De la Concorde Boulevard | Place de la Concorde in Paris | At De La Concorde station: | ||
Montmorency | Collège Montmorency | François de Montmorency-Laval (first Roman Catholic Bishop of Quebec and landowner of Île Jésus) |
Terminus Montmorency |
See also
[edit]References
[edit]- ^ "Métro history". Société de transport de Montréal. Retrieved October 25, 2016.
- ^ Magder, Jason (13 Oct 2016). "The métro at 50: Building the network". Montreal Gazette.
- ^ Guimont, Marc (2007). Montréal en métro (in French) (2 ed.). Montreal, Quebec, Canada: Guides de voyage Ulysse inc. p. 8. ISBN 978-2-89464-782-0.
- ^ Magder, Jason (13 Oct 2016). "The métro at 50: Building the network". Montreal Gazette.
- ^ Negru, Myer (7 August 1967). "Extensions For Subway Approved". Montreal Gazette. p. 3.
- ^ "L'inauguration du métro de Montréal". Radio-Canada (in Canadian French). 2021-10-13. Retrieved 2023-08-21.
- ^ "Horizon 2000". Ville de Montréal (in French). YouTube. 1967. Archived from the original on 2021-12-12. Retrieved 9 September 2012.
- ^ Gaston, J., Le métro de Montréal, Montréal : Communauté urbaine de Montréal, Bureau de transport métropolitain, 1976 p.61,
- ^ "Laval Metro Expansion". Agence métropolitaine de transport. Archived from the original on May 6, 2013.
- ^ Sutherland, Anne (December 15, 2010). "Métro elevator plans stall". Montrealgazette.com. Retrieved March 10, 2011.
- ^ "Elevator access to the métro". Retrieved August 4, 2020.
- ^ ""Les ascenseurs des stations Lionel-Groulx et Berri-UQAM maintenant en service." Métro (Montreal). September 14, 2009. Retrieved September 20, 2009". Journalmetro.com. December 21, 2010. Archived from the original on July 27, 2011. Retrieved March 10, 2011.
- ^ "Universal access". Société de transport de Montréal. Retrieved 2024-01-31.
- ^ "STM Metro accessibility plan will mean more elevators, ramps". Canadian Broadcasting Corporation. March 7, 2017. Retrieved August 4, 2020.
- ^ Iskander, Elsa (2019-10-15). "La ligne orange pourrait être équipée de portes palières d'ici 2026 | JDM". Journal de Montreal. Archived from the original on 2019-10-15. Retrieved 2022-09-25.
- ^ "2021-2030 Capital Expenditure Program" (PDF). Société de transport de Montréal. 30 October 2020. p. 84. Retrieved 25 September 2022.
- ^ Constructo, Portail. "Programme des immobilisations 2022-2031 : la STM prévoit des sommes de 15,9 G$". www.portailconstructo.com (in Canadian French). Retrieved 2022-09-25.
Ainsi, le projet d'installation de portes palières sur la ligne orange, qui était évalué à 568 M$, a été annulé.
- ^ "Plan de transport — Le métro" (in French). Ville de Montréal. Retrieved 7 September 2012.
- ^ St-Amour, Stéphane (July 22, 2007). "Montréal a bien d'autres priorités". Courrier Laval (in French). Archived from the original on May 27, 2012.
- ^ St-Amour, Stéphane (May 26, 2011). "Métro: Laval réclame cinq nouvelles stations". Courrier Laval (in French). Archived from the original on July 20, 2011. Retrieved May 30, 2011.
- ^ Magder, Jason (2019-10-02). "Completing Montreal métro's Orange Line loop will cost an estimated $4.3B | Montreal Gazette". Montreal Gazette. Retrieved 2019-10-03.
- ^ Bruemmer, René (2018-05-09). "What, where, how and why: New Montreal métro garage at Côte-Vertu | Montreal Gazette". Montreal Gazette. Retrieved 2019-10-03.
- ^ a b "Line 2 - Orange". Société de transport de Montréal. Retrieved 2023-08-19.
- ^ McMillan, Barclay; Keillor, Elaine (February 25, 2015). "Joseph-Marcel-Rodolphe Plamondon". The Canadian Encyclopedia.